![]() This repair work is expected to run through Friday morning, May 20.īeginning Sunday, crews will work 9 p.m. Beginning overnight Sunday, work starts on the I-95/I-495 Beltway bridge ramp to Md. 5/Branch Avenue in Prince George’s County will be underway. The Maryland Department of Transportation State Highway Administration announced two new projects slated to begin on Sunday. Three lanes will be closed for bridge work with periodic full stops overnight. I-66 East Route 234 bypass Prince William Parkway to Cub Run Bridge: Friday, 9 p.m. I-66 East from Route 29 to Manassas Rest Area: Friday, 10 a.m. The left lane will be closed for bridge work. Friday, May 13, continuously through 5 a.m. I-66 East at Cub Run Bridge: Beginning at 9 p.m. I-66 East from Bull Run Bridge to Cub Run Bridge: Friday, May 13: 9 p.m. Three lanes will be closed for overhead bridge work with periodic stoppages overnight. I-66 East from Route 234 Business (Sudley Road) to Manassas Safety Rest Area: Friday, May 13: 9 p.m. to 6 a.m., three lanes will be closed for overhead bridge work with periodic short stoppages between 10:30 p.m. I-66 East and West at Route 28: On Friday, May 13, and Saturday, May 14, from 10 p.m. Monday, May 16, the ramps will be closed for demolition of the old concrete barrier along the ramps. Friday, May 13, continuously through 4:30 a.m. Ramps from Stringfellow Road to I-66 East/from I-66 West to Stringfellow Road: Beginning at 10:30 p.m. Both nights, three lanes will be closed for overhead bridge beam installation approaching Stringfellow Road. I-66 East from east of Route 28 to Stringfellow Road: Friday, May 13, and Saturday, May 14: 10 p.m. Drivers should expect periodic stoppages during the overnight hours. Three lanes will be closed for overhead bridge work. I-66 West from Jermantown Road to Route 50: Friday, May 13: 9:30 p.m. Two lanes are closed for Nutley Street rehabilitation work. I-66 East from Vaden Drive to Nutley Street: Friday, May 13: 9 p.m. The left lane will be closed for a traffic shift. I-66 West at Vaden Drive: Friday, May 13: 9 a.m. The left lane will be closed for drainage and barrier work. I-66 East from Blake Lane to Vaden Drive: Friday, May 13: 10:30 a.m. Ramp closed and detoured overhead bridge work.Īll ramps from I-495 North to I-66 will be closed and detoured Friday and Saturday between 10 p.m. I-66 East ramp to I-495 North: Saturday, 10 p.m. Three lanes are closed for nightly over bridge work with periodic full stops planned overnight. If possible, the VDOT work schedule looks like this. Traffic will be directed farther west to the exit to Vienna/Fairfax/GMU Station, stay to the right onto Country Creek Road, continue onto Virginia Center Boulevard, and then turn right to head south at the Nutley Street traffic signal. Ramp from I-66 West to Nutley Street South: The ramp will be closed from midnight to 5 a.m.Traffic will be directed to exit to Nutley Street South, stay to the left and make a U-turn at the traffic signal at Saintsbury Drive onto Nutley Street North. Ramp from I-66 East to Nutley Street North: The ramp will be closed from midnight to 5 a.m.Nutley Street North and South at I-66: Nutley Street will be reduced to a single travel lane in each direction between 10 p.m.(Courtesy VDOT)ĭetails to implement the traffic pattern change include:įriday, May 13 (Saturday, May 14, will be used as backup) ![]() ![]() Map of traffic change coming to the Nutley Street I-66 interchange. This temporary traffic pattern will allow the construction of the new Nutley Street interchange. Two travel lanes will run in each direction on the west side of the bridge over I-66. Roadwork VirginiaĪ highlight of this weekend’s Transform 66 Outside the Beltway Project - travel lanes of northbound and southbound Nutley Street over I-66 will be shifted to the west during the overnight hours of Friday, May 13. Here’s what you need to know this weekend. Metro is performing a test run of their summer shutdown and Platform Project. There is more rain in the forecast through this weekend, but weather permitting, stops are planned on the Capital Beltway and Interstate 66 with work and events in the District, Purple Line construction and paving in Maryland. Business & Finance Click to expand menu.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |